作者:Zilong WANG,Haoyu WU,Huazhang LIN,Hao LIU
摘要:In tunnel construction,groundwater is often dried up,and vegetation around the tunnel is exhausted due to excessive water inflow.Based on the requirement of environmental sustainable development,it is of great practical significance to carry out in-depth research on this issue.Taking Jiupansi Tunnel crossing Xichang-Shangri-La Expressway as an example,on the basis of engineering geological investigation,the types of groundwater flow are studied,and the ways of groundwater discharge and recharge are analyzed.Afterwards,the surface runoff,underground catchment and water inflow caused by the construction are calculated.The results show that during the construction period of the tunnel,the maximum water inflow is 6041 m 3/d,and the normal water inflow is 2041 m 3/d;the groundwater level is lowered,and the maximum influence radius of the funnel is 157 m.From the point of view of groundwater and ecological environment impact,it is reasonable and feasible to construct tunnels under the condition of strengthening advance prediction,which will not cause larger groundwater environmental problems and have less impact on nearby residents and upper ecology.
发文机构:City College Sichuan Highway Planning China Three Gorges Construction Management Co.
关键词:TUNNELGROUNDWATERWaterinrushRUNOFF
分类号: P64[天文地球—地质矿产勘探]